top of page
sk.jpg

Production Maintenance

IECNS brings together the best international engineering team, including Korea and Mexico.
IECNS understands the business culture and how Korean and American companies operate. We serve as the bridge between different cultures. We bring teams from various parts of the world to reduce cost structures. Our solutions are not limited to the latest engineering innovations; we achieve cost efficiency by assembling a top-tier team.
Satisfaction guaranteed with the best engineering team for your projects.
Labor cost reduction through international sourcing.

At IECNS, we provide engineers to support Korean electric vehicle battery manufacturers.

We have a strong understanding of the automation equipment manufacturing process and are capable of providing comprehensive solutions to our clients. Our team has experience in various industries, including the automotive industry. We have also worked extensively in secondary cell equipment manufacturing, with a team of experienced engineers.

Reliable Project Execution:

Support in the installation of manufacturing equipment from abroad
Reliable Project Execution:

Reliable Project Execution:

Reliable Project Execution:


Business Process Outsourcing (BPO):

Sourcing and procurement
Supply chain management
Human resources management
IT support
Equipment maintenance

triangle.png

Vehicle Manufacturers 

Battery Manufacturers 

Automatization
& Equipment

Since the electric vehicle battery and semiconductor industries are rapidly growing, the demand for business operations in the U.S. is also increasing among Korean companies. As a result, they face the following challenges:

First, illegal practices concerning U.S. labor and immigration laws.
Second, a lack of long-term technical service solutions.
Third, a lack of experience in U.S. business operations.

GC Selection Services

 Requirement Analysis:
o    Assess project scope, timeline, and technical specifications.
o    Identify required GC qualifications, certifications, and expertise.

 

Bid Process Management:
o    Preparing Request for Proposal (RFP) documents.
o    Managing bid invitations, vendor inquiries, and submission timelines.
o    Conducting bid evaluations based on cost, experience, and technical capabilities.

 

Contract Negotiation:
o    Reviewing contract terms to ensure alignment with project goals.
o    Establishing clear deliverables, payment milestones, and penalty clauses

GC Management Services

 Pre-Setup Planning:
o    Defining work schedules, resource allocation, and site preparation.
o    Coordinating equipment delivery timelines with the GC.

 

On-Site Supervision:
o    Ensuring adherence to engineering drawings, layout plans, and technical guidelines.
o    Managing GC activities such as mechanical installation, electrical wiring, and utility setup.
•    Compliance and Safety Management:
o    Verifying OSHA, NFPA 70E, and local regulatory compliance.
o    Overseeing risk assessments, safety protocols, and emergency response plans.

 

Progress Monitoring and Reporting:
o    Tracking milestones, task completion rates, and budget utilization.
o    Conducting regular progress meetings and addressing delays or issues.

 

Quality Control and Final Inspection:
o    Performing equipment calibration, system integration checks, and performance validation.
o    Ensuring proper documentation for inspection approvals and client sign-off

Post-Installation Support

  Warranty and Maintenance Coordination: 
o    Managing GC responsibilities for post-installation support.
o    Ensuring documentation of warranties, maintenance schedules, and spare parts inventory

Value Proposition

•    Risk Mitigation: Minimizing delays, budget overruns, and quality issues.
•    Expert Guidance: Leveraging industry best practices for efficient GC coordination.
•    Cost Efficiency: Streamlining resource allocation and optimizing timelines.

  • Whatsapp
  • Linkedin
  • Untitled-8 (2)

Copyright © 2023 IECNS LLC. All Rights Reserved. 

© 2035 by Success Consulting. Powered and secured by Wix

bottom of page